Discover Cát Lái Invesco Residential Area: A Strategic Resettlement and Urban Development Project in District 2
Cát Lái Invesco Residential Area is one of the key real estate projects in District 2 (now Thu Duc City), Ho Chi Minh City, developed by Invesco – Ho Chi Minh City Investment and Service Joint Stock Company. The project plays an important role not only in providing housing and supporting urban resettlement but also in contributing to the city’s housing fund development strategy and socio-economic growth.
Located on Nguyễn Thị Định Street, Cát Lái Ward, District 2, Ho Chi Minh City, the project covers an impressive land area of 152.9 hectares. It aims to serve resettlement needs for the Thu Thiem New Urban Area and meet the growing demand for modern apartment living, offering a high-quality and convenient residential environment.

Overview of Cát Lái Invesco Residential Project
Project Purpose and Scale
The Cát Lái Invesco Residential Area is developed with a dual purpose: to serve resettlement for the Thu Thiem New Urban Area and to support the policy of urban population redistribution. This is part of Ho Chi Minh City’s housing development strategy up to 2010 and beyond, aiming to address housing demand through modern apartment development trends aligned with global urban standards. The project plays a significant role in promoting sustainable socio-economic development in District 2.
The project spans a total land area of 152.9 hectares, with an estimated total investment of VND 6,000 billion, reflecting its large-scale and serious development commitment from Invesco JSC.
Structural Composition
The project is comprehensively planned with a combination of residential and social infrastructure components:
- High-rise housing (5–25 floors): Apartment buildings covering 23.17 hectares, designed to accommodate a large population, especially resettlement residents.
- Townhouses and villas: Low-rise residential areas covering 42.48 hectares, offering diverse housing options and forming a balanced residential community.

Strategic Location of Cát Lái Invesco Residential Area
Convenient Position
The project is located on Nguyễn Thị Định Street, Cát Lái Ward, District 2, Ho Chi Minh City. This location provides easy access to the city center and benefits from the rapidly developing transport infrastructure of District 2. It offers strong liquidity potential and long-term value appreciation.
Situated on a key transportation route, Nguyễn Thị Định Street, the project allows convenient travel to surrounding areas and the city’s new administrative center. Although detailed location descriptions are limited, its position clearly lies within a high-growth urban development zone.
Geographic Coordinates
- Latitude: 10.77229881
- Longitude: 106.7878418
These coordinates confirm the project’s precise location within the city’s master planning map.

Implementation Plan and Infrastructure Development
Technical Infrastructure Planning
One of the highlights of the project is its comprehensive infrastructure investment, ensuring a modern and sustainable living environment:
- Electricity and water supply systems are designed synchronously to meet the entire project’s demand.
- Modern drainage systems for rainwater and wastewater to prevent flooding.
- Well-planned internal road network and spacious sidewalks for smooth transportation.
- Public services such as postal facilities and extensive green landscaping for a clean environment.
- Standardized fire protection systems ensuring maximum safety.

Social Facilities Development
The project also integrates essential social infrastructure to improve residents’ quality of life:
- Commercial centers for shopping and services.
- Schools providing quality education for residents’ children.
- Parks and green spaces for recreation and community activities.
- Healthcare stations for primary medical services.

Project Implementation Timeline
The project is expected to be completed over 5 to 7 years, divided into two main phases:
Phase 1 (2005–2009): Infrastructure and Land Clearance
- Completion of compensation and site clearance.
- Construction of technical infrastructure, roads, and green spaces.
Between 2005 and 2007, approximately 50 hectares of infrastructure were developed and handed over for Thu Thiem resettlement purposes. Additionally, 19.23 hectares were allocated for public facilities.
Phase 2 (2009–2015): Housing and Social Facilities Construction
- Construction of high-rise and low-rise residential buildings.
- Completion of schools, commercial centers, and other public amenities.

Pricing and Investment Information
Reference Price Range
The estimated price range is approximately 63.33 – 175.63 million VND/m².
This wide range reflects the diversity of product types and locations within the 152.9-hectare development. With a total investment of VND 6,000 billion, the project demonstrates strong value and long-term investment potential.
Project Significance
Cát Lái Invesco Residential Area is not just a real estate project but a comprehensive urban development initiative aimed at resettlement, population redistribution, and contributing to Ho Chi Minh City’s urban growth strategy. It reflects modern housing development trends aligned with international standards.
Invesco has committed significant investment and a structured implementation plan, ensuring the project becomes a model residential area in District 2.
In conclusion, Cát Lái Invesco Residential Area is a notable project with a strategic location, large-scale planning, and clear socio-economic objectives. It is an ideal choice for both end-users and investors seeking opportunities in Ho Chi Minh City’s dynamic real estate market.