Overview
Status:  Sold
Price:  19₫
Description

In-Depth Review of CT3 Southwest Linh Dam Apartment Project: A Residential and Investment Opportunity in Hoang Mai, Hanoi

Southern Hanoi has consistently been a hotspot in the real estate market thanks to its synchronized infrastructure development and urban planning. Among the standout developments, CT3 Southwest Linh Dam Apartment remains a compelling option for both homebuyers and investors. Located in a strategic position within the model urban area of Linh Dam, the project benefits from a fully developed ecosystem while offering a modern and convenient living space. This article provides a comprehensive and in-depth analysis of the project, covering its location, scale, developer, pricing, and payment policies.

Overall perspective of CT3 Southwest Linh Dam project

Overview of CT3 Southwest Linh Dam Project

CT3 Southwest Linh Dam Apartment is a key residential development by one of Vietnam’s leading housing developers. The project was designed to provide a high-quality living environment, integrating essential services within the building and its surrounding area.

Basic Project Information

The project is developed by Housing and Urban Development Corporation (HUD), a reputable name associated with successful urban areas such as Linh Dam, Van Canh, My Dinh, Van Quan, and Viet Hung. This strong developer backing ensures construction quality and legal transparency.

  • Project Name: CT3 Southwest Linh Dam
  • Developer: Housing and Urban Development Corporation (HUD), with HUD3 as the implementing unit
  • Address: No. 38 Linh Duong Street, Hoang Liet Ward, Hoang Mai District, Hanoi
  • Total Land Area: 6,000 m²
  • Construction Area: 1,400 m²
  • Scale: 21 above-ground floors and 1 basement
  • Total Floor Area: Approximately 30,000 m²
  • Status: Completed and operational, ready for occupancy

Actual image of CT3 Southwest Linh Dam building

Location Analysis and Connectivity

Location is a decisive factor in real estate value. CT3 Southwest Linh Dam sits at the corner of Southwest Linh Dam Urban Area, offering excellent connectivity and access to a fully developed urban ecosystem.

Transportation Advantages

Situated at No. 38 Linh Duong Street, residents can easily connect to major transportation routes:

  • Approximately 3 minutes to Ring Road 3 elevated highway.
  • About 5 minutes to Giai Phong – Van Dien axis.
  • 10 minutes to National Highway 70.
  • 15 minutes to National Highway 5.

Within a 1.5 km radius, major bus stations such as Nuoc Ngam and Giap Bat provide convenient interprovincial travel.

Surrounding Boundaries

  • North: Adjacent to North Linh Dam expansion (X2)
  • South: Internal road (11.5m) and green park area CX4
  • East: Linh Duong Street and future HH4 commercial center
  • West: Internal road (13.5m) and CT02 high-rise building

Linh Dam area and surrounding amenities

Amenities and Infrastructure

As part of Linh Dam Urban Area, the project benefits from a fully developed infrastructure system and social amenities.

Internal Facilities

  • 04 high-speed elevators
  • 24/7 security system
  • Spacious basement parking
  • Integrated commercial center
  • Community and entertainment areas
  • High-speed internet and ADSL system

External Advantages

Residents benefit from schools, hospitals, parks, and the large Linh Dam lake, creating a green and livable environment.

Amenities and shared spaces

Apartment Design and Layout

The building consists of 21 floors with well-optimized apartment layouts maximizing natural light and ventilation.

  • 2-bedroom units: 62.7 m², 65.5 m², 69.5 m²
  • 3-bedroom units: 91.1 m², 96.9 m²

Layouts are designed for efficiency and comfort, suitable for various family sizes.

Typical apartment layout

Pricing and Financial Policy

Price Overview

Initial price was around 18.7 million VND/m². Current secondary market prices range from 72.2 to 93.1 million VND/m² depending on unit characteristics.

  • 2-bedroom units: 4.5 – 6.37 billion VND
  • 3-bedroom units: 5.6 – 8.46 billion VND

Payment Schedule

  1. 30% upon contract signing
  2. 10% at 10th floor completion
  3. 10% at 15th floor completion
  4. 20% at final floor completion
  5. 30% upon handover + 2% maintenance fee

Location map

Investment Potential and Conclusion

CT3 Southwest Linh Dam is both a practical living solution and a stable investment channel. Its location within a mature urban area ensures liquidity and long-term value growth.

Key strengths include:

  • Prime location within Linh Dam urban area
  • Completed infrastructure
  • Strong rental demand

With its established legal status, competitive pricing, and sustainable growth potential, CT3 Southwest Linh Dam remains a top choice in Hoang Mai District.

Project perspective



Location

No. 38 Linh Duong Street, Hoang Liet Ward, Hoang Mai District, Hanoi.


Project video

Share this project:



Write a review

Please log in to write review!




Contact

Máy tính thế chấp

$

Drag the slider or enter the amount you want to borrow

80% 100%
$
%/year
$

Calculate Your Mortgage

Enter your property price and loan details above to see estimated monthly payments and total interest.

Amortization Schedule

Loan Amount 0 $
Total Interest 0 $
Total Amount 0 $